Cabin and Pond in the USA

UNITED ARAB EMIRATES

 

Up
Summer 2002
Summer 2004
Summer 2005

August 2002

  • Relocated Farm Office to New Pond to Serve as My Cabin.
  • "Plumbed" water to the Cabin from the Camphouse Well.
  • Installed Septic Tank.

Winter 2003

  • Built a new porch for the Cabin.

August 2003

  • Planted a combination of about 100 trees, plants, flowers, and bushes.
  • Had Cabin piped for Propane Gas.
  • Installed antique style stove and wall heater.
  • Purchased 1 AC wall unit.

August 2004-present

  • Installed 911 Address Sign and Mailbox
  • Purchased and moved 3 Cabin-like Storage Units (12ft x 30ft) to the Cabin.
  • Purchased driveway sewer pipes for water drainage.
  • Made a big mistake by verbally contracting AND PAYING for the office to be remodeled.
  • Added a room to serve as the kitchen and dining room.
  • Converted the original second room into a full bathroom, hallway, and laundry room.
  • Raised the roof and ceilings of the Cabin.
  • Roofed the Cabin with Red Tin.
  • Painted the Cabin.
  • Blocked the Cabin.
  • Installed new appliances.
  • Screened the porch.
  • Installed wood-like floating floor system.
  • Installed 2 AC wall units.

Winter 2006

  • The first event at the Cabin was held.  Many relatives gathered together for a special meal!
 

 

 

R. Stewart Braswell, Webmaster
Last Updated: 02 December 2011